Gold Member Since 2012
Audited Supplier
Xuzhou Hercules Machine Manufacture Co., Ltd.

Vibratory Driver, Vibration Gravel Pile Driver, Vibrating Pile manufacturer / supplier in China, offering Vibratory Driver 24m Sand / Stone Piling Machine, 4 Ton Knuckle Boom Truck-Mounted Crane (SQ4ZA2), HDG Series Multi-Function Drilling Machine and so on.

(/ )

Supplier Homepage Product Gravel Pile Driver Vibratory Driver 24m Sand / Stone Piling Machine

Vibratory Driver 24m Sand / Stone Piling Machine

Purchase Qty.:
(Pieces)
1 2+
FOB Unit Price: US $300,000 US $100,000
Purchase Qty. (Pieces) FOB Unit Price
1 US $300,000
2+ US $100,000
Get Latest Price
Port: Lianyungang, China
Production Capacity: 500units
Payment Terms: T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: KLB series
  • Pressure Pile Driver Type: Mechanical Pile Driver
  • Power Source: Electric
  • Noise: With Noise
  • Condition: New
  • Trademark: HAIGELISI
  • Specification: 24m
  • HS Code: 8430100000
  • Type: Vibration Piling Machine
  • Pile Hammer Type: Vibration Hammer
  • Motor Power: 90kw
  • Certification: ISO 9001:2008
  • Max Piling Depth: 30m
  • Transport Package: in Container
  • Origin: China
Product Description
Vibratory pile driver, pile driver machine, Vibratory driver
Vibratory Driver 24m Sand / Stone Piling Machine


Vibration Gravel Pile Driver machine is popularly used for the foundation construction of high-rise building. The hydraulic rotation of this vibratory pile driver is flexible and could rotate 360°.
 The vibratory driver could be self-installed and self-discharging and it is easy to move because of the Hydraulic Foot-Step system. When transporting, the upper frame will be folded back and the rotary drive do not need to dismantle.
With the characters of convenient maintaining and operating, stable and reliable performance, highly economical and efficient, this pile driver machine is the best investment to improve your business productivity.
Vibratory pile driver's operation process:
1. Move the pile machine and body frame; make the pile tip align with pile location.
2. Drive the Vibratory Hammer; drop the pile to the established depth.
3. Fill in the required volume gravel to the pile machine.
4. Pump the air into the pile machine by air compressor.
5. Lift the machine 1~2m, the gravel will drop to the drilling hole by the air pressure and gravity.
6. Drop the pile machine to ensure the gravel compact.
7. Repeat above the 4,5,6, process
8. When the gravel in the pile machine to be used at the allowed volume, fill in the gravel again, then repeat above 4,5,6 process
9. When the pile machine lifted to the designed height of the pile top, all the process complete; by this means, the construction speed is 1.5~2.6 times than the routine methods.
 
 
Send your message to this supplier
Avatar
Miss Vivien Cheng
Manager
*From:
To: Miss Vivien Cheng
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now