Gold Member Since 2012
Audited Supplier
Xuzhou Hercules Machine Manufacture Co., Ltd.

Vibration Piling Machine, Pile Driver, Vibrating Pile Driver manufacturer / supplier in China, offering High Power Vibration Gravel Pile Driver, Engineering Hydraulic Cylinder High Demand, Wjcb15 Wick Drain Installation Rig and so on.

(/ )

Supplier Homepage Product Gravel Pile Driver High Power Vibration Gravel Pile Driver

High Power Vibration Gravel Pile Driver

FOB Price: US $50,000-300,000 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $50,000-300,000/ Piece
Get Latest Price
Port: Lianyungang, China
Production Capacity: 50units
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Product Catalog
Multifunction / Vibrating Gravel Pile Driver
19 Products
Content
Product Image
Product Name
FOB Price
Port
Basic Info
  • Model NO.: DCB series
  • Pressure Pile Driver Type: Mechanical Pile Driver
  • Power Source: Electric
  • Noise: With Noise
  • Condition: New
  • Max. Piling Depth: 15m
  • Transport Package: Container
  • Origin: China
  • Type: Vibration Piling Machine
  • Pile Hammer Type: Vibratory Hammer
  • Motor Power: 90kw
  • Certification: ISO 9001:2008
  • Max. Piling Diameter: 800mm
  • Trademark: HERCULES
  • Specification: ISO9001
  • HS Code: 8430100000
Product Description
Vibratory pile driver, pile driver machine, Vibratory driver
High Power Vibration Gravel Pile Driver
Vibration Gravel Pile Driver is the popular machine used for the foundation construction of high-rise building. The hydraulic rotation of this kind of vibration Pipe Gravel Pile is flexible and could rotate 360° . The machinery could be self-installed and self-discharging and it is easy to move because of the Hydraulic Foot-Step system. When transporting, the upper frame will be folded back and the rotary drive do not need to dismantle. With the characters of convenient maintaining and operating, stable and reliable performance, highly economical and efficient, it is the best investment to improve your business productivity.
Operation Process:
1, Move the pile machine and body frame, make the pile tip align with pile location.
2, Drive the Vibratory Hammer, drop the pile to the established depth.
3, Fill in the required volume gravel to the pile machine.
4, Pump the air into the pile machine by air compressor.
5, Lift the machine1- 2m, the gravel will drop to the drilling hole by the air pressure and gravity.
6, Drop the pile machine to ensure the gravel compact.
7, Repeat above (4), (5), (6) process.
8, When the gravel in the pile machine to be used at the allowed volume, fill in the gravel again, then repeat above (4), (5), (6) process.
9, When the pile machine lifted to the designed height of the pile top, all the process complete.
By this means, the construction speed is 1.5-2.6 times than routine methods.
Technical DataModel
DCB60-75SDCB80-90SDCB80-110SDCB100-120S
Max Vibratory Hammer ModelDD63/TD50       /DZ75KSDD83/TD62  /DZ90KSDD83/TD62        /DZ90KSDD103/TD100    /DZ120KS
Max. Piling Diameter (mm)600800800800
Max. Piling Depth (m)15151515
Main Winch Line Pull (T)58810
Auxiliary Winch Line Pull (T)3355
Traveling MotionHydraulic         Foot-StepHydraulic   Foot-StepHydraulic         Foot-StepHydraulic           Foot-Step
Max. Gradient of Groundwork2 o2 o2 o2 o
Rotation Angle360 o360 o360 o360 o
Overall Dimensionworking condition13x5.3x25m13x5.3x25m13x5.3x25m13x5.3x25m
Transportation condition15.8x2.5x3.38m15.8x2.5x3.38m15.8x2.5x3.38m15.8x2.5x3.38m
Overall Weight (T)35454555
Send your message to this supplier
Avatar
Miss Vivien Cheng
Manager
*From:
To: Miss Vivien Cheng
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now