Jiangsu, China
Business Type:
Manufacturer/Factory
Business Range:
Construction & Decoration, Industrial Equipment & Components, Manufacturing & Processing ...
Registered Capital:
2.22 Million USD
Plant Area:
20530.87 square meters
Management System Certification:
ISO 9001
OEM/ODM Service

Gravel Pile Driver, Sand Pile Machine, Sand Piling Machine manufacturer / supplier in China, offering Vibration Gravel/Sand Pile Driver Machine, Lorry-Mounted Crane (Knuckle Boom) (SQ2ZA1), Telescopic Boom Lorry Mounted Crane Sq6SA2 and so on.

Gold Member Since 2012
Audited Supplier

Vibration Gravel/Sand Pile Driver Machine

Get Latest Price
Purchase Qty. / Reference FOB Price
1 Piece US $300,000
2+ Pieces US $5,000
Port: Lianyungang, China
Production Capacity: 500 Units
Payment Terms: T/T
Type: Vibration Piling Machine
Pressure Pile Driver Type: Mechanical Pile Driver
Pile Hammer Type: Vibration Hammer
Power Source: Electric
Motor Power: 90kw
Noise: With Noise

You Might Also Like

Loading...

Basic Info

Model NO.: DCB series
Certification: ISO 9001:2008
Condition: New
Trademark: HAIGELISI
Transport Package: in Container
Specification: construction machine
Origin: China
HS Code: 843010000

Product Description

Vibratory pile driver, pile driver machine, Vibratory driver
Vibration Gravel/Sand Pile Driver Machine


Vibration Gravel Pile Driver machine is popularly used for the foundation construction of high-rise building. The hydraulic rotation of this vibratory pile driver is flexible and could rotate 360°.
 The vibratory driver could be self-installed and self-discharging and it is easy to move because of the Hydraulic Foot-Step system. When transporting, the upper frame will be folded back and the rotary drive do not need to dismantle. 
With the characters of convenient maintaining and operating, stable and reliable performance, highly economical and efficient, this pile driver machine is the best investment to improve your business productivity.
Vibratory pile driver's operation process:
1. Move the pile machine and body frame; make the pile tip align with pile location.
2. Drive the Vibratory Hammer; drop the pile to the established depth.
3. Fill in the required volume gravel to the pile machine.
4. Pump the air into the pile machine by air compressor.
5. Lift the machine 1~2m, the gravel will drop to the drilling hole by the air pressure and gravity.
6. Drop the pile machine to ensure the gravel compact.
7. Repeat above the 4,5,6, process
8. When the gravel in the pile machine to be used at the allowed volume, fill in the gravel again, then repeat above 4,5,6 process
9. When the pile machine lifted to the designed height of the pile top, all the process complete; by this means, the construction speed is 1.5~2.6 times than the routine methods.
 
Main technical details of this Vibratory Gravel driver:
Technical DataModel
DCB60-75SDCB80-90SDCB80-110SDCB100-120S
Max Vibratory Hammer ModelDD63/TD50/DZ75KSDD83/TD62/DZ90KSDD83/TD62/DZ90KSDD103/TD100/DZ120KS
Max. Piling Diameter (mm)600800800800
Max. Piling Depth (m)15151515
Main Winch Line Pull (T)58810
Auxiliary Winch Line Pull (T)3355
Traveling MotionHydraulic Foot-StepHydraulic Foot-StepHydraulic Foot-StepHydraulic Foot-Step
Max. Gradient of Groundwork2o2o2o2o
Rotation Angle360o360o360o360o
Overall
Dimension
working condition13x5.3x25m13x5.3x25m13x5.3x25m13x5.3x25m
transportation condition15.8x2.5x3.38m15.8x2.5x3.38m15.8x2.5x3.38m15.8x2.5x3.38m
Overall Weight (T)35454555
 
We can make the equipment according to your requirement, if you have interests about our piling machinery, you can scan our web pages www.piledriver.cn    
 

Send your message to this supplier

*From:
*To:
avatar Miss Vivien Cheng
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

People who viewed this also viewed